Salinas Valley Hospital Seismic Retrofit

Project Details

Currently in design/preconstruction, this is a fast track collaborative design-build project consisting 3 major components. The first is the seismic upgrade of existing non-structural (NPC-4) components throughout the entire hospital complex. The work requires careful attention to detail and in depth collaboration with the active hospital staff in an occupied facility. This work will include upgrades to medical equipment, mechanical, plumbing and electrical systems. The second component is to increase the hospitals capabilities to operate standalone from existing city infrastructure and will require the installation of tankage to store, water, sanitary waste and fuel. The final major component is to provide structural upgrades to the existing hospital building to withstand current seismic requirements.